Pumping stations construction

Omega Group participates as a subcontractor in a project to build pumping stations for the water and sewerage system. The project includes the construction of several new pumping stations for water supply and the reconstruction of existing pumping capacity, in order to improve water delivery, pressure, security and efficiency.

  • New pumping stations with optimised pumping units and standby capacity
  • Reconstruction of existing stations: pump replacement, repair of pumping rooms and electrical installations
  • Installation of pressure and flow control systems
  • Integration of automation and remote monitoring (SCADA) of key parameters
  • Ensuring reliable water supply during peak loads

Project goals

The project aims to reduce water losses, ensure stable pressure and high water quality, and improve the operational reliability of the water supply network through modern infrastructure and automation. It also targets improved readiness for emergencies and temporary supply interruptions.

Contact us